裝修費用 Cost

$1,540,000

  • 1 清拆工程
    ● 清拆全屋舊有地台
    ● 清拆客廁所磁磚及瓦仔
    ● 清拆主人房廁所
    ● 清拆廚房磁磚及廚櫃
    ● 清拆舊有大廳裝飾物
    ● 清拆房間衣櫃
    ● 清拆舊有鋁窗
    2 電力工程
    ● 新造60a 三相電掣箱
    ● 新造全屋電掣位
    ● 新造全屋燈掣開關
    3 水喉工程
    ● 新造廚房冷熱水
    ● 新造廚房去水喉
    ● 新造工人房冷熱水
    ● 新造工人房去水喉
    ● 新造客廁所洗手盆冷熱水
    ● 新造客廁所企缸冷熱水
    ● 新造客廁所白色去水喉
    ● 新造主人房洗手盆冷熱水
    ● 新造主人房浴缸冷熱水
    ● 新造主人房去水喉
    ● 安裝主人房浴缸
    ● 新做外牆入水喉冷熱水
    4 泥水工程
    ● 新造客廁所牆身批盪
    ● 新造客廁所牆身(磁磚1200x600)
    ● 新造客廁所地台(磁磚1200x600)
    ● 新造主人房牆身批盪
    ● 新造主人房牆身(磁磚900x1800)
    ● 新造主人房地台(磁磚900x1800)
    ● 新造主人房浴缸圍邊牆身
    ● 新造廚房牆身批盪
    ● 新造廚房牆身磁磚(1200x600)
    ● 新造廚房地台磁磚磁磚1200x600)
    ● 新造客飯廳地台磁磚磁(1200x600)
    5. 油漆工程
    ● 全屋剷底及防潮油
    ● 全屋批灰三次及打磨
    ● 全屋用上立邦立邦五合一第二代
    ● 燈槽批灰及窗簾殼
    6 鋁窗工程
    ● 外牆搭棚架
    ● 更換全屋鋁窗50料
    ● 更換露台玻璃趟門
    7 木工工程
    ● 新做日字型燈槽
    ● 新造全屋窗簾殼及露台
    ● 新造大門子母門
    ● 新造廚房半自動索趟門
    ● 新做三間房間房門三套
    ● 新造廁所門兩套
    ● 新造廚房去工人房掩門一套
    ● 新造工人房廁所巴士摺門
    ● 新造走廊及房間木地板
    8 傢俬工程
    ● 新做l型廚櫃
    ● 新造廚房吊櫃
    ● 新造上下櫃及雪櫃
    ● 新做l型檯面石及洗菜盤
    ● 主人房新造全高櫃衣櫃
    ● 客房新造全高櫃衣櫃
    ● 新造主人房廁所上下鏡櫃
    ● 新造客廁所上下鏡櫃
    9 冷氣工程
    ● 安裝三匹四面出風一部
    ● 安裝兩匹半掛牆分體機
    ● 安裝一部兩匹掛牆分體機
    ● 安裝三部掛牆一匹分體機
    10 其他工程
    ● 新造廁所鋁質天花兩套
    ● 新造廚房鋁質天花
    ● 新造工人房鋁質天花
    ● 安裝煤氣爐及煤氣喉
    ● 全屋清潔
    ● 全屋保護
    ● 工程衍生垃圾處理
    ● 工程保險

  • 1. Demolition Works
    • Demolish existing platforms throughout the house
    • Remove tiles and bricks in the guest bathroom
    • Demolish the master bedroom toilet
    • Remove tiles and kitchen cabinets in the kitchen
    • Demolish existing decorations in the living room
    • Remove wardrobes in the rooms
    • Demolish existing aluminum windows
    2. Electrical Works
    • Install a new 60A three-phase electrical switchboard
    • Install new electrical sockets throughout the house
    • Install new light switches throughout the house
    3. Plumbing Works
    • Install hot and cold water supply in the kitchen
    • Install drainage system in the kitchen
    • Install hot and cold water supply in the worker's room
    • Install drainage system in the worker's room
    • Install hot and cold water supply for the guest bathroom sink
    • Install hot and cold water supply for the guest bathroom bathtub
    • Install white drainage system in the guest bathroom
    • Install hot and cold water supply for the master bedroom sink
    • Install hot and cold water supply for the master bedroom bathtub
    • Install drainage system in the master bedroom
    • Install bathtub in the master bedroom
    • Install hot and cold water supply for the exterior wall
    4. Masonry Works
    • Plaster the walls in the guest bathroom
    • Tile the walls in the guest bathroom (1200x600)
    • Tile the floor in the guest bathroom (1200x600)
    • Plaster the walls in the master bedroom
    • Tile the walls in the master bedroom (900x1800)
    • Tile the floor in the master bedroom (900x1800)
    • Construct walls around the master bedroom bathtub
    • Plaster the walls in the kitchen
    • Tile the walls in the kitchen (1200x600)
    • Tile the floor in the kitchen (1200x600)
    • Tile the floor in the dining area (1200x600)
    5. Painting Works
    • Apply a base coat and moisture-proof paint throughout the house
    • Apply three coats of plaster and sanding throughout the house
    • Apply Nippon Paint 5-in-1 for all walls
    • Apply plaster and paint the light troughs and curtain casings
    6. Aluminum Window Works
    • Install scaffolding on the exterior walls
    • Replace all aluminum windows with grade 50 aluminum
    • Replace the glass sliding door on the terrace
    7. Carpentry Works
    • Construct a new Japanese-style light trough
    • Build window casings and terrace structures
    • Install main entrance double-leaf doors
    • Install semi-automatic sliding doors for the kitchen
    • Install three sets of room doors for the bedrooms
    • Install two sets of toilet doors
    • Install a concealed door between the kitchen and worker's room
    • Install a folding door for the worker's room bathroom
    • Install wooden flooring in the corridors and rooms
    8. Furniture Works
    • Build an L-shaped kitchen cabinet
    • Construct kitchen overhead cabinets
    • Build upper and lower cabinets and a refrigerator compartment
    • Construct an L-shaped stone countertop and sink in the kitchen
    • Install full-height wardrobe in the master bedroom
    • Install full-height wardrobe in the guest room
    • Install upper and lower mirror cabinets in the master bedroom toilet
    • Install upper and lower mirror cabinets in the guest bathroom
    9. Air Conditioning Works
    • Install one 3HP four-way air conditioning unit
    • Install two 1.5HP split air conditioning units
    • Install one 2HP split air conditioning unit
    • Install three 1HP split air conditioning units
    10. Other Works
    • Install aluminum ceiling in the toilet (two sets) and kitchen
    • Install aluminum ceiling in the worker's room
    • Install gas stove and gas pipes
    • Complete house cleaning
    • Provide protective measures for the entire project
    • Dispose of construction waste
    • Project insurance coverage


心動不如行動!立即留低你既聯絡方式!

Take action now! Leave your contact information with us.

Let’stalk

裝修諮詢/ 公司加盟 

9444 5095
服務時間 Office Hour
星期一至五 Mon to Fri 10am - 8pm
星期六 Sat 10am - 2pm

  • Instagram
  • Facebook
  • Youtube

Renovation Consultation / Company Franchise

bottom of page